From 2c8cda03e70793943a5c44f1e2ec51041929f201 Mon Sep 17 00:00:00 2001 From: Affaan Mustafa Date: Tue, 12 May 2026 12:56:52 -0400 Subject: [PATCH] docs: record ECC Tools Linear backlog sync (#1811) --- docs/ECC-2.0-GA-ROADMAP.md | 17 +++++++++++------ 1 file changed, 11 insertions(+), 6 deletions(-) diff --git a/docs/ECC-2.0-GA-ROADMAP.md b/docs/ECC-2.0-GA-ROADMAP.md index dbfada37..1c0e887d 100644 --- a/docs/ECC-2.0-GA-ROADMAP.md +++ b/docs/ECC-2.0-GA-ROADMAP.md @@ -109,6 +109,10 @@ As of 2026-05-12: - ECC-Tools PR #38 added PR review/stale-salvage predictive follow-ups, a PR Review/Salvage Evidence taxonomy bucket, and maintained corpus fixtures for stale-closure salvage, reviewer-thread, and reopen-flow evidence. +- ECC-Tools PR #39 added opt-in native Linear GraphQL sync for deferred + follow-up backlog items, preserving GitHub object caps while creating or + reusing Linear issues when `LINEAR_API_KEY` and `LINEAR_TEAM_ID` are + configured. - ECC PR #1803 landed the contributor Quarkus handling branch after maintainer cleanup, current-`main` alignment, full local validation, and preservation of the author's removal of incomplete ja-JP and zh-CN Quarkus translations. @@ -144,12 +148,12 @@ is not complete unless the evidence column exists and has been freshly verified. | Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness gate exists | Not complete | | Articles, tweets, and announcements | X thread, LinkedIn copy, GitHub release copy, push checklist | Draft launch collateral exists under rc.1 release docs | Needs URL-backed refresh | | AgentShield enterprise iteration | Policy gates, SARIF, packs, provenance, corpus, HTML reports, exception lifecycle audit | PRs #53, #55-#62 landed with test evidence | Needs PDF/export decision or next enterprise signal | -| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog | PRs #26-#38 landed with test evidence | Needs native Linear API sync / broader evaluator corpus | +| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog | PRs #26-#39 landed with test evidence | Needs capacity-backed Linear rollout / broader evaluator corpus | | GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy and deterministic follow-up checks | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, and PR Review/Salvage Evidence | Partially complete | | Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates exist | Needs evaluation/RAG prototype | | Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation is blocked by workspace limit | Needs recurring status updates | | Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below | Active | -| Realtime Linear sync | Project updates while issue limit is blocked; issues later | Follow-up flood-control and Linear-ready backlog tables exist in ECC Tools | Needs native API sync once capacity clears | +| Realtime Linear sync | Project updates while issue limit is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items | Needs workspace capacity/config rollout | | Observability for self-use | Local readiness gate, traces, status snapshots, risk ledger | `npm run observability:ready` reports 14/14 | Complete for local gate | | Proper release and notifications | Release tag, npm publish state, plugin state, social posts | Publication readiness gate exists | Not complete | @@ -167,7 +171,7 @@ back to the repo evidence and merge commits. | Harness OS core | Audit, adapter matrix, observability docs, `ecc2/` | HUD/session-control acceptance spec | Weekly until GA | | Evaluation and RAG | Reference-set validation, harness audit, traces | Read-only evaluator/RAG prototype design | Before deep analyzer expansion | | AgentShield enterprise | AgentShield PR evidence and roadmap notes | PDF-export decision or next enterprise signal | After value decision | -| ECC Tools app | ECC-Tools PR evidence, billing audit, risk taxonomy | Native Linear sync or broader evaluator/RAG corpus slice | Next implementation batch | +| ECC Tools app | ECC-Tools PR evidence, billing audit, risk taxonomy | Capacity-backed Linear rollout or broader evaluator/RAG corpus slice | Next implementation batch | | Linear progress | Linear project status updates and this mirror | Status update with queue/evidence/missing gates | Every significant merge batch | The project status update should always include: @@ -329,8 +333,9 @@ Acceptance: - Harness-config quality predictive follow-ups flag MCP, plugin, agent, hook, command, and harness config changes that lack audit, adapter matrix, cross-harness doc, or compatibility regression evidence. -- Linear sync design maps findings to issues/status without flooding the - workspace, and deferred follow-up comments include a Linear-ready table. +- Linear sync maps deferred backlog findings to Linear issues without flooding + GitHub, creates or reuses exact-title Linear issues when configured, and + reports skipped sync when credentials or team configuration are absent. - Follow-up generation caps automatic GitHub object creation and keeps overflow findings in a copy-ready project sync backlog. @@ -356,7 +361,7 @@ Acceptance: 1. Decide whether AgentShield PDF export adds value beyond the merged HTML executive report, corpus benchmark output, and exception lifecycle audit. -2. Add native Linear API sync for ECC Tools backlog items after workspace issue +2. Enable/configure the merged Linear backlog sync path after workspace issue capacity clears. 3. Expand the evaluator/RAG corpus with real cleanup-batch cases as future maintainer-owned examples land.