From 78c8b9b69b92d3fa7053d4b65b50ac24ee22a050 Mon Sep 17 00:00:00 2001 From: Affaan Mustafa Date: Tue, 12 May 2026 09:36:05 -0400 Subject: [PATCH] docs: add ECC 2.0 execution tracking checklist --- docs/ECC-2.0-GA-ROADMAP.md | 54 ++++++++++++++++++++++++++++++++++++++ 1 file changed, 54 insertions(+) diff --git a/docs/ECC-2.0-GA-ROADMAP.md b/docs/ECC-2.0-GA-ROADMAP.md index 2df0c10e..bd62f31a 100644 --- a/docs/ECC-2.0-GA-ROADMAP.md +++ b/docs/ECC-2.0-GA-ROADMAP.md @@ -85,6 +85,9 @@ As of 2026-05-12: plugin, agent, hook, command, and harness config changes that lack harness audit, adapter matrix, cross-harness docs, or compatibility regression evidence. +- ECC PR #1803 landed the contributor Quarkus handling branch after maintainer + cleanup, current-`main` alignment, full local validation, and preservation of + the author's removal of incomplete ja-JP and zh-CN Quarkus translations. ## Operating Rules @@ -100,6 +103,57 @@ As of 2026-05-12: maintainer-owned branches, and credit the source PR. - Do not create new Linear issues until the active issue limit is cleared. +## Prompt-To-Artifact Execution Checklist + +This table keeps the long operator prompt tied to concrete artifacts. A status +is not complete unless the evidence column exists and has been freshly verified. + +| Prompt requirement | Required artifact or gate | Current evidence | Status | +| --- | --- | --- | --- | +| Keep public PRs below 20 | Repo-family PR recheck | 0 open PRs across the tracked public repos on 2026-05-12 | Complete for this checkpoint | +| Keep public issues below 20 | Repo-family issue recheck | 0 open issues across the tracked public repos on 2026-05-12 | Complete for this checkpoint | +| Manage PR discussions | PR review/comment closure plus merge/close state | #1803 was maintainer-edited and merged; no open PRs remain | Complete for this checkpoint | +| Salvage useful stale work | `docs/stale-pr-salvage-ledger.md` | Ledger records salvaged, superseded, skipped, and manual-review tails | Complete except #1687 manual review | +| ECC 2.0 preview pack ready | Release docs, quickstart, publication readiness, release notes | `docs/releases/2.0.0-rc.1/` and readiness docs are in-tree | Needs final release evidence | +| Hermes specialized skills included safely | Hermes setup/import docs and sanitized skill surface | Hermes setup and import playbook are public; secrets stay local | Needs final release review | +| Naming and rename readiness | Naming matrix across package/plugin/docs/social surfaces | Milestone 1 defines the needed matrix | Not complete | +| Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness gate exists | Not complete | +| Articles, tweets, and announcements | X thread, LinkedIn copy, GitHub release copy, push checklist | Draft launch collateral exists under rc.1 release docs | Needs URL-backed refresh | +| AgentShield enterprise iteration | Policy gates, SARIF, packs, provenance, corpus, HTML reports | PRs #53, #55-#60 landed with test evidence | Needs next value decision | +| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog | PRs #26-#33 landed with test evidence | Needs skill/RAG and Linear sync slice | +| GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy and deterministic follow-up checks | ECC-Tools risk taxonomy check plus follow-up signals landed | Partially complete | +| Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates exist | Needs evaluation/RAG prototype | +| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation is blocked by workspace limit | Needs recurring status updates | +| Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below | Active | +| Realtime Linear sync | Project updates while issue limit is blocked; issues later | Follow-up flood-control exists in ECC Tools | Not complete | +| Observability for self-use | Local readiness gate, traces, status snapshots, risk ledger | `npm run observability:ready` reports 14/14 | Complete for local gate | +| Proper release and notifications | Release tag, npm publish state, plugin state, social posts | Publication readiness gate exists | Not complete | + +## Execution Lanes And Tracking Contract + +Until Linear issue capacity is cleared, this document is the durable execution +ledger and Linear receives project status updates only. When capacity is +available, each lane below should become a small set of Linear issues linked +back to the repo evidence and merge commits. + +| Lane | Source of truth | Next tracked artifact | Update cadence | +| --- | --- | --- | --- | +| Queue hygiene and salvage | GitHub PR/issue state, salvage ledger | Append ledger entries for any future stale closures | Every cleanup batch | +| Release and publication | rc.1 release docs, publication readiness doc | Naming matrix and plugin submission/contact checklist | Before any tag | +| Harness OS core | Audit, adapter matrix, observability docs, `ecc2/` | HUD/session-control acceptance spec | Weekly until GA | +| Evaluation and RAG | Reference-set validation, harness audit, traces | Read-only evaluator/RAG prototype design | Before deep analyzer expansion | +| AgentShield enterprise | AgentShield PR evidence and roadmap notes | PDF-export decision or next enterprise signal | After value decision | +| ECC Tools app | ECC-Tools PR evidence, billing audit, risk taxonomy | Skill-quality/RAG follow-up signal slice | Next implementation batch | +| Linear progress | Linear project status updates and this mirror | Status update with queue/evidence/missing gates | Every significant merge batch | + +The project status update should always include: + +1. Current public PR and issue counts. +2. Merged evidence since the previous update. +3. Deferred or blocked items with the reason. +4. The next one or two implementation slices. +5. Any release or publication gate that is still not evidence-backed. + ## Reference Pressure The GA roadmap is informed by these reference surfaces: