docs: refresh may 19 evidence after linear sync merge

This commit is contained in:
Affaan Mustafa
2026-05-19 11:10:51 -04:00
committed by Affaan Mustafa
parent ac7434ea8f
commit d6022d6b8d
5 changed files with 20 additions and 17 deletions

View File

@@ -2,8 +2,8 @@
This dashboard is generated by `npm run operator:dashboard`. It is an operator snapshot, not release approval.
Generated: 2026-05-19T14:47:22.463Z
Commit: c7d662c3c68719e5ef0b5305ca3f6782b3214224
Generated: 2026-05-19T15:08:49.870Z
Commit: ac7434ea8f39166b11e9d06ce64b38c4fb8d9202
Status: work remaining
## Current Status

View File

@@ -8,7 +8,7 @@ release action after the final evidence commands are rerun from the intended
release commit.
Source commit for the clean evidence baseline this packet extends:
`e7a7b2aaa33c0657cad9db3fa2ced0e636cd0f8c`.
`ac7434ea8f39166b11e9d06ce64b38c4fb8d9202`.
## Current Evidence
@@ -19,7 +19,7 @@ Source commit for the clean evidence baseline this packet extends:
| Video suite | ready true, 15/15 source assets, 13/13 suite artifacts, 12/12 publish candidates | yes |
| Release surface tests | 27/27 passed after this packet was added | yes |
| Full local suite | 2550/2550 passed after this packet was added | yes |
| GitHub CI | PR #1998, PR #1999, PR #2000, and PR #2001 merged after green required checks | verify current head |
| GitHub CI | PR #1998, PR #1999, PR #2000, PR #2001, PR #2002, and PR #2004 merged after green required checks | verify current head |
## Decision Register

View File

@@ -25,7 +25,7 @@ surfaces, or posting announcements.
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-16.md` | Current May 16/17 queue cleanup, recsys skill merge, GateGuard triage, PR #1947 supply-chain protection, AgentShield #87 plugin-cache confidence evidence, AgentShield #88 evidence-pack inspect/readback, AgentShield #89 evidence-pack fleet routing, AgentShield #90 fleet review items, AgentShield #91 policy export, AgentShield #92 policy promotion, ECC-Tools #76 fleet-summary consumption, ECC-Tools #77 hosted finding evidence paths, ECC-Tools #78 harness policy-route linking, dashboard refresh, and combined Node/Rust/release-surface gate evidence through the May 16 mirror | Must still be repeated from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-17.md` | May 17 queue-zero state, Japanese localization merge, Dependabot TypeScript and Node type merges, post-merge ja-JP lint repair, Mini Shai-Hulud/TanStack protection recheck, npm audit/signature checks, legacy and Linear progress routing, deterministic preview-pack smoke, operator dashboard refresh, Linear sync, and GitHub CI evidence for `27dc2918` | Superseded by the May 18 evidence snapshot; repeat from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-18.md` | May 18 queue-zero state, #1970/#1971/#1972 merge batch, #1978 review/closure, supply-chain recheck, AgentShield evidence mirror, Linear sync, current-head CI/security scan success for `4470e2e6`, and ITO-46 naming/plugin publication closure | Superseded by the May 19 ECC identity, video, and growth evidence snapshot |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-19.md` | Current May 19 evidence for canonical ECC identity, release video suite, partner/sponsor/talk outreach pack, owner approval packet, May 19 operator dashboard, preview-pack smoke digest `790430aef4a8`, 2550-test local suite, PR #1998 visual QA CI success, PR #1999 dashboard evidence CI success, PR #2000 suite-count evidence success, PR #2001 owner approval packet CI success, PR #2002 owner-approval dashboard gate CI success, and the May 19 Linear sync document | Current strongest readiness snapshot; must still be repeated from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-19.md` | Current May 19 evidence for canonical ECC identity, release video suite, partner/sponsor/talk outreach pack, owner approval packet, May 19 operator dashboard, preview-pack smoke digest `790430aef4a8`, 2550-test local suite, PR #1998 visual QA CI success, PR #1999 dashboard evidence CI success, PR #2000 suite-count evidence success, PR #2001 owner approval packet CI success, PR #2002 owner-approval dashboard gate CI success, PR #2004 Linear readiness evidence sync CI success, and the May 19 Linear sync document | Current strongest readiness snapshot; must still be repeated from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-17.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 18 generated dashboard |
| `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-18.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 19 generated dashboard |
| `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` | Current prompt-to-artifact operator dashboard | Shows PR/issue/discussion/platform/supply-chain gates current and adds the current `$1,728/mo` to `$10,000/mo` hypergrowth, video owner-approval, and outbound-pack operating lanes |

View File

@@ -8,9 +8,9 @@ social announcement.
| Field | Evidence |
| --- | --- |
| Upstream main | `c7d662c3c68719e5ef0b5305ca3f6782b3214224` |
| Upstream main | `ac7434ea8f39166b11e9d06ce64b38c4fb8d9202` |
| Git remote | `https://github.com/affaan-m/ECC.git` |
| Evidence scope | Current `main` after PR #1990 harness-audit GitHub integration scoring, PR #1991 canonical ECC identity gate, PR #1992 release video-suite gate, PR #1993 growth outreach pack, PR #1994 May 19 publication evidence refresh, PR #1995 operator dashboard refresh, PR #1996 primary render self-eval gate, PR #1997 publish-candidate gate, PR #1998 visual QA gate, PR #1999 video dashboard evidence refresh, PR #2000 suite-count evidence refresh, PR #2001 owner approval packet addition, and PR #2002 owner approval dashboard gate refresh |
| Evidence scope | Current `main` after PR #1990 harness-audit GitHub integration scoring, PR #1991 canonical ECC identity gate, PR #1992 release video-suite gate, PR #1993 growth outreach pack, PR #1994 May 19 publication evidence refresh, PR #1995 operator dashboard refresh, PR #1996 primary render self-eval gate, PR #1997 publish-candidate gate, PR #1998 visual QA gate, PR #1999 video dashboard evidence refresh, PR #2000 suite-count evidence refresh, PR #2001 owner approval packet addition, PR #2002 owner approval dashboard gate refresh, and PR #2004 Linear readiness evidence sync |
| Local status caveat | `git status --short --branch` was clean after pulling `origin/main`; generated evidence files are committed after the source snapshot they describe |
The release operator must repeat all publish-facing checks from the exact final
@@ -51,6 +51,7 @@ Tracked repositories in the platform audit were:
| PR #2000 | Merged the suite-count evidence refresh so the platform audit rejects stale local-suite totals |
| PR #2001 | Merged the final human decision sheet for release, package, plugin, video, billing, social, and outbound approvals; GitHub Actions run `26102500291` completed successfully |
| PR #2002 | Merged the owner-approval dashboard refresh so the operator dashboard fails closed when the final decision sheet is missing or incomplete; CI passed before merge |
| PR #2004 | Merged the May 19 Linear readiness evidence sync after PR #2002, including roadmap, dashboard, preview-pack manifest, publication evidence, operator dashboard generator, and release-surface test updates |
## Release And Growth Evidence
@@ -58,13 +59,14 @@ Tracked repositories in the platform audit were:
| --- | --- | --- |
| Release-surface tests | `node tests/docs/ecc2-release-surface.test.js` | 27 passed, 0 failed |
| Preview-pack smoke | `npm run preview-pack:smoke -- --format json` | Ready true; digest `790430aef4a8`; 31 required artifacts; 5 passed, 0 failed |
| Operator dashboard | `npm run operator:dashboard -- --write docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` | Regenerated from `c7d662c3c68719e5ef0b5305ca3f6782b3214224` with platform audit ready true, 0 tracked PRs, 0 tracked issues, 0 discussion gaps, `$1,728/mo` current MRR, `$10,000/mo` target MRR, the release video suite marked current, and top actions for plugin publication, notifications, outbound approval, AgentShield, and ECC Tools billing |
| Operator dashboard | `npm run operator:dashboard -- --write docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` | Regenerated from `ac7434ea8f39166b11e9d06ce64b38c4fb8d9202` with platform audit ready true, 0 tracked PRs, 0 tracked issues, 0 discussion gaps, `$1,728/mo` current MRR, `$10,000/mo` target MRR, the release video suite marked current, and top actions for plugin publication, notifications, outbound approval, AgentShield, and ECC Tools billing |
| Release video suite | `npm run release:video-suite -- --format json --summary` with `ECC_VIDEO_SOURCE_ROOT` and `ECC_VIDEO_RELEASE_SUITE_ROOT` | Ready true; 15/15 source assets present; 13/13 render, timeline, caption, EDL, and segment artifacts present; 12/12 publish-candidate outputs present with zero detected black-frame segments; primary rough render self-eval passed at 144.759 seconds, 1920x1080, 1 audio stream, and 106.78 MB |
| Full local suite | `node tests/run-all.js` | 2550 passed, 0 failed |
| PR #1998 CI | GitHub Actions run `26099020341` | Completed successfully for `d500de1e9f11c0446b6a1349bd98b522d31f9125`; all reported checks passed, including lint, validation, security scan, coverage, GitGuardian, CodeRabbit, Cubic, and the macOS/Ubuntu/Windows test matrix |
| PR #1999 CI | GitHub Actions run `26100148726` | Completed successfully for `90584b6d5e5814bc2ad9a4cd651bebd043de989d`; lint, validation, security scan, coverage, GitGuardian, CodeRabbit, and the macOS/Ubuntu/Windows test matrix passed; Cubic completed neutral and did not block merge |
| PR #2001 CI | GitHub Actions run `26102500291` | Completed successfully for `8148340ad14eb32c971346f0cb4cb9431ec0f5de`; required checks passed before merge |
| PR #2002 CI | GitHub Actions run `26103853507` | Completed successfully before merge; required checks passed, Cubic remained non-blocking, and PR #2002 merged into `main` as `c7d662c3c68719e5ef0b5305ca3f6782b3214224` |
| PR #2004 CI | GitHub Actions run `26105012698` | Completed successfully after rerunning the single failed Windows Node 18 yarn job; required checks passed, Cubic remained non-blocking, and PR #2004 merged into `main` as `ac7434ea8f39166b11e9d06ce64b38c4fb8d9202` |
| Linear sync | Linear document `ecc-may-19-post-pr-2002-sync-64cef8f668e0` plus project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543` | Project and issue lanes now record PR #2002 evidence, discussion #2003 routing, owner-approval dashboard gate, and In Progress status for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56 |
| Public-path sanitization | `node scripts/ci/validate-no-personal-paths.js` through local suite and CI | Passed |
| Markdown and whitespace | `markdownlint` focused release docs plus `git diff --check` before PR #1999 | Passed |
@@ -106,7 +108,7 @@ Tracked repositories in the platform audit were:
The tracked public PR queue, issue queue, discussion queue, canonical ECC
identity, release video suite, preview pack, and growth outreach packet are
current on May 19, 2026 for `main` through
`c7d662c3c68719e5ef0b5305ca3f6782b3214224`. The remaining video work is
`ac7434ea8f39166b11e9d06ce64b38c4fb8d9202`. The remaining video work is
owner approval, upload, and public URL attachment, not render or QA production.
This improves publication readiness but does not replace the approval-gated