@@ -173,6 +173,14 @@ its own text agrees with itself — the tests it specifies against the code it
|
|
|
specifies, the files it creates against the files it later touches. "The scan
|
|
|
is clean" without those rows is not a scan you ran.
|
|
|
|
|
|
+**When the plan's header declares `Plan shape: skeleton-first`,** the
|
|
|
+table gets a final section: the DISPATCH PLAN — group the pending tasks
|
|
|
+into waves. Tasks in the same wave are mutually file-disjoint and consume
|
|
|
+no interface still under construction — dispatch each wave's implementers
|
|
|
+concurrently, one worktree per task, and integrate before the next wave;
|
|
|
+tasks that fail those conditions serialize. On a skeleton-first plan, a
|
|
|
+scan without a dispatch plan is not a scan you ran.
|
|
|
+
|
|
|
Write the table to the ledger. Rule on everything you find before execution
|
|
|
begins — each finding against the plan text that mandates it — and record
|
|
|
each ruling in the ledger. If the scan is clean, proceed without comment.
|
|
|
@@ -259,7 +267,13 @@ and fix-round diffs need it.
|
|
|
know; (4) your resolution of any ambiguity you noticed in the brief;
|
|
|
(5) the report-file path and report contract. Exact values (numbers,
|
|
|
magic strings, signatures, test cases) appear only in the brief. Never
|
|
|
- make a subagent read the whole plan file.
|
|
|
+ make a subagent read the whole plan file. When the brief is a contract
|
|
|
+ (goal, success criteria, interfaces) rather than written-out code, item
|
|
|
+ (3) also carries the elaboration the contract leaves to dispatch time:
|
|
|
+ the interfaces as actually built by completed tasks, environment facts
|
|
|
+ and discoveries from earlier reports, and any amendment rulings. There
|
|
|
+ the success criteria name the cases the tests must cover, and the
|
|
|
+ implementer designs its own code and tests within the contract.
|
|
|
- **Report file:** name the implementer's report file after the brief
|
|
|
(brief `…/task-N-brief.md` → report `…/task-N-report.md`) and put it in
|
|
|
the dispatch prompt. The implementer writes the full report there and
|
|
|
@@ -280,6 +294,26 @@ and fix-round diffs need it.
|
|
|
- Record the implementer's agent identity from the dispatch result —
|
|
|
fix-loop rounds 1-3 resume this agent.
|
|
|
- Never dispatch multiple implementation subagents in parallel (conflicts).
|
|
|
+ The one exception is a skeleton-first plan whose dispatch plan shows two
|
|
|
+ or more pending tasks mutually file-disjoint with none consuming an
|
|
|
+ interface still under construction. Dispatch those implementers
|
|
|
+ concurrently, each in its own worktree:
|
|
|
+ - Record the integration base commit in the ledger before the first
|
|
|
+ concurrent dispatch.
|
|
|
+ - Create one worktree per concurrent task off that base
|
|
|
+ (`git worktree add <repo-root>/.worktrees/task-<N> -b task-<N>
|
|
|
+ <base>`); each dispatch's `Work from:` is its own worktree, and its
|
|
|
+ BASE is that worktree's HEAD.
|
|
|
+ - Review each task's diff as usual when it reports. Integrate reviewed
|
|
|
+ branches in plan order: merge each into the integration branch
|
|
|
+ (`git merge --no-ff task-<N>`), and run that task's verification
|
|
|
+ commands after each merge.
|
|
|
+ - A merge conflict or post-merge verification failure is that task's
|
|
|
+ fix-loop round 1: rebase the task branch onto the current
|
|
|
+ integration head in its worktree, then resume its implementer
|
|
|
+ there. Never resolve conflicts yourself.
|
|
|
+ - Remove each worktree (`git worktree remove`) once its branch is
|
|
|
+ integrated, and record the integrated range in the ledger as usual.
|
|
|
|
|
|
Template: [implementer-prompt.md](implementer-prompt.md)
|
|
|
|
|
|
@@ -438,6 +472,16 @@ message as your other bookkeeping:
|
|
|
- `Task <N>: complete (commits <base7>..<head7>, <K> parked)` after a
|
|
|
tripped breaker
|
|
|
|
|
|
+**On a skeleton-first plan,** write one plan-check line with the
|
|
|
+completion line. Re-read the remaining tasks against what this task
|
|
|
+actually established — interfaces as built, environment facts,
|
|
|
+discoveries in the report — and append either `Plan holds` or
|
|
|
+`Amendment: Task <M>: <what changes and why>` to the ledger. An
|
|
|
+amendment is plan authority applied at the plan layer: from then on the
|
|
|
+amended text IS the plan's text, and it rides into every affected task's
|
|
|
+dispatch under item (3). Never dispatch a task whose brief a completed
|
|
|
+task's report has already invalidated.
|
|
|
+
|
|
|
Then mark the todo complete and move on. Never move to the next task while
|
|
|
the review has open Critical/Important issues that are neither fixed nor
|
|
|
parked-with-ruling at the cap.
|