mirror of
https://github.com/affaan-m/everything-claude-code.git
synced 2026-05-14 16:38:40 +08:00
docs: sync roadmap after ECC-Tools depth readiness (#1871)
This commit is contained in:
@@ -80,6 +80,11 @@ As of 2026-05-13:
|
||||
and made `/ecc-tools followups sync-linear` track copy-ready PR drafts in
|
||||
the Linear/project backlog when `open-pr-drafts` is not used, preserving
|
||||
useful stale-PR salvage work without opening extra PR shells.
|
||||
- ECC-Tools PR #55 merged as `5d8c112cce4794cfa089d5b0ea661ba87a178be1`
|
||||
and added analysis-depth readiness to `/ecc-tools analyze` comments,
|
||||
separating commit-history-only repos from evidence-backed and deep-ready repos
|
||||
using CI/CD, security, harness, reference/eval, AI routing/cost-control, and
|
||||
team handoff evidence.
|
||||
- Handoff `ecc-supply-chain-audit-20260513-0645.md` under
|
||||
`~/.cluster-swarm/handoffs/`
|
||||
records the May 13 supply-chain sweep: no active lockfile/manifest hit for
|
||||
@@ -263,6 +268,11 @@ As of 2026-05-13:
|
||||
artifact contract so canonical bundle files now satisfy the taxonomy and
|
||||
generated follow-up PRs point maintainers at
|
||||
`agentshield scan --evidence-pack <dir>`.
|
||||
- ECC-Tools PR #55 added the first hosted/deeper-analysis readiness signal:
|
||||
analysis comments now classify a repo as commit-history-only,
|
||||
evidence-backed, or deep-ready before routing work into CI, AgentShield,
|
||||
harness, reference-set, RAG/evaluator, AI-routing, cost-control, and
|
||||
Linear/project-tracking lanes.
|
||||
- ECC PR #1803 landed the contributor Quarkus handling branch after maintainer
|
||||
cleanup, current-`main` alignment, full local validation, and preservation of
|
||||
the author's removal of incomplete ja-JP and zh-CN Quarkus translations.
|
||||
@@ -316,10 +326,10 @@ is not complete unless the evidence column exists and has been freshly verified.
|
||||
| Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission |
|
||||
| Articles, tweets, and announcements | X thread, LinkedIn copy, GitHub release copy, push checklist | Draft launch collateral exists under rc.1 release docs | Needs URL-backed refresh |
|
||||
| AgentShield enterprise iteration | Policy gates, SARIF, packs, provenance, corpus, HTML reports, exception lifecycle audit, baseline drift Action/CLI surfaces, evidence-pack redaction, harness adapter registry, enterprise research roadmap, supply-chain hardened release path, CI-safe baseline fingerprints, corpus accuracy recommendations, remediation workflow phases, env proxy hijack corpus coverage | PRs #53, #55-#64, #67-#69, and #78-#82 landed with test evidence; native PDF export deferred in favor of self-contained HTML plus print-to-PDF until explicit enterprise demand appears; `docs/architecture/agentshield-enterprise-research-roadmap.md` now has baseline drift, evidence-pack bundle, redaction, adapter-registry, supply-chain hardening, hashed baseline fingerprints, corpus accuracy recommendation, remediation workflow, and env proxy hijack corpus slices landed | Next hosted evidence-pack workflow depth |
|
||||
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus | PRs #26-#43 plus #53/#54 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, and PR draft follow-up Linear tracking | Needs hosted/deeper analysis follow-up |
|
||||
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness | PRs #26-#43 plus #53-#55 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, and evidence-backed/deep-ready repository classification | Needs hosted execution path for deeper analysis recommendations |
|
||||
| GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy, deterministic follow-up checks, and local supply-chain gates | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, PR Review/Salvage Evidence, and AgentShield evidence-pack evidence; #1846 added npm registry signature gates; #1848 added the supply-chain incident-response playbook and `pull_request_target` cache-poisoning validator guard; #1851 added the privileged checkout credential-persistence guard; AgentShield #78, JARVIS #13, and ECC-Tools #53 applied the same hardening outside trunk | Current supply-chain gate complete; deeper hosted review features remain future |
|
||||
| Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts | Local corpus complete; hosted integration remains future |
|
||||
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit; this May 13 sync adds ECC #1860, AgentShield #78/#79, JARVIS #13, ECC-Tools #53/#54, resolved queue/discussion counts, and Linear project status updates `59f630eb`/`c7ea6daf` | Needs recurring status updates after each merge batch |
|
||||
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit; this May 13 sync adds ECC #1860, AgentShield #78-#82, JARVIS #13, ECC-Tools #53-#55, resolved queue/discussion counts, and Linear project status updates through AgentShield #82 | Needs recurring status updates after each merge batch |
|
||||
| Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below and `docs/architecture/progress-sync-contract.md` makes GitHub/Linear/handoff/roadmap sync part of the readiness gate | Active |
|
||||
| Realtime Linear sync | Project updates while issue limit is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary while issue capacity is blocked | Needs workspace capacity/config rollout |
|
||||
| Observability for self-use | Local readiness gate, traces, status snapshots, HUD/status contract, risk ledger, progress-sync contract | `npm run observability:ready` reports 21/21 | Complete for local gate |
|
||||
|
||||
Reference in New Issue
Block a user