feat: Review Readiness Dashboard + gstack-slug helper (v0.5.1) (#130)

* feat: add bin/gstack-slug helper + migrate all inline SLUG computation

Extract the opaque SLUG sed pipeline into a shared 5-line shell script.
Replace 8 inline copies across templates with eval $(gstack-slug).
Sanitizes branch names (/ → -) to prevent subdirectory creation.

* feat: review readiness dashboard — track CEO/Eng/Design reviews per branch

Each review skill logs its result to JSONL. A shared {{REVIEW_DASHBOARD}}
placeholder displays run counts, timestamps, and a CLEARED TO SHIP verdict.
/ship pre-flight reads the dashboard and prompts when reviews are missing.

* chore: bump version and changelog (v0.5.1)

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>

---------

Co-authored-by: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
Garry Tan
2026-03-17 10:33:46 -05:00
committed by GitHub
parent 5f41cd9ad7
commit 73b00b4e29
23 changed files with 407 additions and 23 deletions

View File

@@ -534,6 +534,53 @@ List every ASCII diagram in files this plan touches. Still accurate?
### Unresolved Decisions
If any AskUserQuestion goes unanswered, note it here. Never silently default.
## Review Log
After producing the Completion Summary above, persist the review result:
```bash
eval $(~/.claude/skills/gstack/bin/gstack-slug 2>/dev/null)
mkdir -p ~/.gstack/projects/$SLUG
echo '{"skill":"plan-ceo-review","timestamp":"TIMESTAMP","status":"STATUS","unresolved":N,"critical_gaps":N,"mode":"MODE"}' >> ~/.gstack/projects/$SLUG/$BRANCH-reviews.jsonl
```
Before running this command, substitute the placeholder values from the Completion Summary you just produced:
- **TIMESTAMP**: current ISO 8601 datetime (e.g., 2026-03-16T14:30:00)
- **STATUS**: "clean" if 0 unresolved decisions AND 0 critical gaps; otherwise "issues_open"
- **unresolved**: number from "Unresolved decisions" in the summary
- **critical_gaps**: number from "Failure modes: ___ CRITICAL GAPS" in the summary
- **MODE**: the mode the user selected (SCOPE_EXPANSION / HOLD_SCOPE / SCOPE_REDUCTION)
## Review Readiness Dashboard
After completing the review, read the review log to display the dashboard.
```bash
eval $(~/.claude/skills/gstack/bin/gstack-slug 2>/dev/null)
cat ~/.gstack/projects/$SLUG/$BRANCH-reviews.jsonl 2>/dev/null || echo "NO_REVIEWS"
```
Parse the output. Find the most recent entry for each skill (plan-ceo-review, plan-eng-review, plan-design-review). Ignore entries with timestamps older than 7 days. Display:
```
+====================================================================+
| REVIEW READINESS DASHBOARD |
+====================================================================+
| Review | Runs | Last Run | Status |
|-----------------|------|---------------------|----------------------|
| CEO Review | 1 | 2026-03-16 14:30 | CLEAR |
| Eng Review | 1 | 2026-03-16 15:00 | CLEAR |
| Design Review | 0 | — | NOT YET RUN |
+--------------------------------------------------------------------+
| VERDICT: 2/3 CLEAR — Design Review not yet run |
+====================================================================+
```
**Verdict logic:**
- **CLEARED TO SHIP (3/3)**: All three have >= 1 entry within 7 days AND most recent status is "clean"
- **N/3 CLEAR**: Show count and list which are missing, have open issues, or are stale (>7 days)
- Informational only — does NOT block.
## Formatting Rules
* NUMBER issues (1, 2, 3...) and LETTERS for options (A, B, C...).
* Label with NUMBER + LETTER (e.g., "3A", "3B").

View File

@@ -452,6 +452,25 @@ List every ASCII diagram in files this plan touches. Still accurate?
### Unresolved Decisions
If any AskUserQuestion goes unanswered, note it here. Never silently default.
## Review Log
After producing the Completion Summary above, persist the review result:
```bash
eval $(~/.claude/skills/gstack/bin/gstack-slug 2>/dev/null)
mkdir -p ~/.gstack/projects/$SLUG
echo '{"skill":"plan-ceo-review","timestamp":"TIMESTAMP","status":"STATUS","unresolved":N,"critical_gaps":N,"mode":"MODE"}' >> ~/.gstack/projects/$SLUG/$BRANCH-reviews.jsonl
```
Before running this command, substitute the placeholder values from the Completion Summary you just produced:
- **TIMESTAMP**: current ISO 8601 datetime (e.g., 2026-03-16T14:30:00)
- **STATUS**: "clean" if 0 unresolved decisions AND 0 critical gaps; otherwise "issues_open"
- **unresolved**: number from "Unresolved decisions" in the summary
- **critical_gaps**: number from "Failure modes: ___ CRITICAL GAPS" in the summary
- **MODE**: the mode the user selected (SCOPE_EXPANSION / HOLD_SCOPE / SCOPE_REDUCTION)
{{REVIEW_DASHBOARD}}
## Formatting Rules
* NUMBER issues (1, 2, 3...) and LETTERS for options (A, B, C...).
* Label with NUMBER + LETTER (e.g., "3A", "3B").