mirror of
https://github.com/affaan-m/everything-claude-code.git
synced 2026-05-14 16:38:40 +08:00
docs: sync roadmap after ECC-Tools hosted planning (#1872)
This commit is contained in:
@@ -85,6 +85,11 @@ As of 2026-05-13:
|
||||
separating commit-history-only repos from evidence-backed and deep-ready repos
|
||||
using CI/CD, security, harness, reference/eval, AI routing/cost-control, and
|
||||
team handoff evidence.
|
||||
- ECC-Tools PR #56 merged as `5b729c88641eafe80f65364bab3fc74d0270f57b`
|
||||
and added the authenticated `/api/analysis/depth-plan` contract that maps
|
||||
analysis-depth readiness into concrete hosted jobs for CI diagnostics,
|
||||
security evidence review, harness compatibility, reference-set evaluation,
|
||||
AI routing/cost review, and team backlog routing.
|
||||
- Handoff `ecc-supply-chain-audit-20260513-0645.md` under
|
||||
`~/.cluster-swarm/handoffs/`
|
||||
records the May 13 supply-chain sweep: no active lockfile/manifest hit for
|
||||
@@ -273,6 +278,9 @@ As of 2026-05-13:
|
||||
evidence-backed, or deep-ready before routing work into CI, AgentShield,
|
||||
harness, reference-set, RAG/evaluator, AI-routing, cost-control, and
|
||||
Linear/project-tracking lanes.
|
||||
- ECC-Tools PR #56 turned that signal into a hosted execution-plan contract:
|
||||
`/api/analysis/depth-plan` returns ready/blocked jobs and next action text
|
||||
without charging analysis usage or creating bundle PRs.
|
||||
- ECC PR #1803 landed the contributor Quarkus handling branch after maintainer
|
||||
cleanup, current-`main` alignment, full local validation, and preservation of
|
||||
the author's removal of incomplete ja-JP and zh-CN Quarkus translations.
|
||||
@@ -326,10 +334,10 @@ is not complete unless the evidence column exists and has been freshly verified.
|
||||
| Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission |
|
||||
| Articles, tweets, and announcements | X thread, LinkedIn copy, GitHub release copy, push checklist | Draft launch collateral exists under rc.1 release docs | Needs URL-backed refresh |
|
||||
| AgentShield enterprise iteration | Policy gates, SARIF, packs, provenance, corpus, HTML reports, exception lifecycle audit, baseline drift Action/CLI surfaces, evidence-pack redaction, harness adapter registry, enterprise research roadmap, supply-chain hardened release path, CI-safe baseline fingerprints, corpus accuracy recommendations, remediation workflow phases, env proxy hijack corpus coverage | PRs #53, #55-#64, #67-#69, and #78-#82 landed with test evidence; native PDF export deferred in favor of self-contained HTML plus print-to-PDF until explicit enterprise demand appears; `docs/architecture/agentshield-enterprise-research-roadmap.md` now has baseline drift, evidence-pack bundle, redaction, adapter-registry, supply-chain hardening, hashed baseline fingerprints, corpus accuracy recommendation, remediation workflow, and env proxy hijack corpus slices landed | Next hosted evidence-pack workflow depth |
|
||||
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness | PRs #26-#43 plus #53-#55 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, and evidence-backed/deep-ready repository classification | Needs hosted execution path for deeper analysis recommendations |
|
||||
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness, hosted execution planning | PRs #26-#43 plus #53-#56 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, evidence-backed/deep-ready repository classification, and the `/api/analysis/depth-plan` hosted job plan | Needs job-specific worker execution for the hosted recommendation lanes |
|
||||
| GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy, deterministic follow-up checks, and local supply-chain gates | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, PR Review/Salvage Evidence, and AgentShield evidence-pack evidence; #1846 added npm registry signature gates; #1848 added the supply-chain incident-response playbook and `pull_request_target` cache-poisoning validator guard; #1851 added the privileged checkout credential-persistence guard; AgentShield #78, JARVIS #13, and ECC-Tools #53 applied the same hardening outside trunk | Current supply-chain gate complete; deeper hosted review features remain future |
|
||||
| Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts | Local corpus complete; hosted integration remains future |
|
||||
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit; this May 13 sync adds ECC #1860, AgentShield #78-#82, JARVIS #13, ECC-Tools #53-#55, resolved queue/discussion counts, and Linear project status updates through AgentShield #82 | Needs recurring status updates after each merge batch |
|
||||
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit; this May 13 sync adds ECC #1860, AgentShield #78-#82, JARVIS #13, ECC-Tools #53-#56, resolved queue/discussion counts, and Linear project status updates through ECC-Tools #55 | Needs recurring status updates after each merge batch |
|
||||
| Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below and `docs/architecture/progress-sync-contract.md` makes GitHub/Linear/handoff/roadmap sync part of the readiness gate | Active |
|
||||
| Realtime Linear sync | Project updates while issue limit is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary while issue capacity is blocked | Needs workspace capacity/config rollout |
|
||||
| Observability for self-use | Local readiness gate, traces, status snapshots, HUD/status contract, risk ledger, progress-sync contract | `npm run observability:ready` reports 21/21 | Complete for local gate |
|
||||
@@ -350,7 +358,7 @@ repo evidence and merge commits.
|
||||
| Harness OS core | Audit, adapter matrix, observability docs, `ecc2/` | HUD/session-control acceptance spec | Weekly until GA |
|
||||
| Evaluation and RAG | Reference-set validation, harness audit, traces, ECC-Tools corpus | Read-only evaluator/RAG prototype plus stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison fixtures | Hosted retrieval/check-run automation plan |
|
||||
| AgentShield enterprise | AgentShield PR evidence and roadmap notes | Remediation workflow depth or corpus expansion follow-up | Next implementation batch |
|
||||
| ECC Tools app | ECC-Tools PR evidence, billing audit, risk taxonomy, evaluator/RAG corpus | ECC-Tools #53 published the supply-chain workflow hardening branch and #54 tracks copy-ready PR drafts in the Linear/project backlog; next work is hosted/deeper analysis follow-up | Next implementation batch |
|
||||
| ECC Tools app | ECC-Tools PR evidence, billing audit, risk taxonomy, evaluator/RAG corpus | ECC-Tools #53 published the supply-chain workflow hardening branch, #54 tracks copy-ready PR drafts in the Linear/project backlog, #55 classifies analysis-depth readiness, and #56 exposes the hosted execution plan; next work is job-specific hosted execution | Next implementation batch |
|
||||
| Linear progress | Linear project status updates, `docs/architecture/progress-sync-contract.md`, and this mirror | Status update with queue/evidence/missing gates | Every significant merge batch |
|
||||
|
||||
The project status update should always include:
|
||||
|
||||
Reference in New Issue
Block a user